Xiongxin high-speed railway

Project Overview
Construction Unit
China Railway 17th Bureau Group
Project Time
2022-2023
Project Introduction
80 m bridge building machine 2022-2023
Construction of equipment with tower crane machinery and bridge building machine
The bridge building machine is a new type of continuous beam cantilever bridge building machine independently designed and developed by our company, and the length of a single pouring segment can reach 6-8 meters.